The Standard Specifications for Construction of Hydrographic Monitoring Boreholes provide detailed guidelines and requirements for constructing boreholes used for hydrographic monitoring purposes. These specifications cover various aspects such as the selection, installation, and maintenance of equipment used in the borehole. The standard also includes information on the design and construction of well heads, casings, and other associated components.One of the key objectives of these regulations is to ensure that the boreholes are installed in a safe and efficient manner, while also providing reliable data for hydrographic analysis. This involves strict adherence to safety standards, including the use of proper protective equipment and procedures for working at depth. The specifications also require that the boreholes be properly maintained to ensure their longevity and reliability.Overall, the Standard Specifications for Construction of Hydrographic Monitoring Boreholes play an important role in ensuring the quality and accuracy of hydrographic data collected from boreholes. By following these guidelines, contractors and engineers can construct wells that meet the highest standards of safety and performance, while also providing the necessary data for accurate hydrographic analysis.

Introduction

Hydrographic monitoring boreholes are essential components of hydrographic survey systems, providing critical information about the water table, seabed topography, and other geological characteristics. The construction of these boreholes must adhere to strict standards to ensure accurate and reliable data. This document outlines the standard specifications for the construction of hydrographic monitoring boreholes, covering aspects such as site selection, borehole drilling, casing installation, and testing. By following these guidelines, hydrographic survey companies can ensure that their boreholes are constructed to the highest possible standards, maximizing the accuracy and reliability of their data.

1. Site Selection

1、1.1

Site selection is a critical process that determines the suitability of the borehole location for hydrographic monitoring. Factors to consider include the depth, consistency of the water table, presence of underwater obstructions, and access to the borehole site. When selecting a borehole site, it is essential to consult with local authorities and obtain relevant permits before commencing work.

1.2.1

After selecting a suitable site, the next step is to conduct a detailed site analysis to assess the potential challenges associated with the borehole construction process. This includes evaluating the soil composition, water table level, and any underground utilities or hazards that may impact the operation of the borehole. Based on these factors, appropriate modifications may need to be made to the borehole design or installation procedures.

1.3.1

Once a satisfactory site has been identified, the next step is to prepare the site by clearing vegetation and debris from the area surrounding the borehole. This ensures that the borehole is easily accessible during the construction process and minimizes the risk of damage to nearby structures or infrastructure.

2. Borehole Drilling

2、1.1

Borehole drilling is a delicate process that requires specialized equipment and trained personnel. The drilling rig must be carefully configured to match the specific requirements of each borehole design, including drill diameter, length, and depth. During drilling, it is crucial to monitor the progress of the borehole using advanced sensors and control systems to ensure that it remains within specified parameters and does not deviate from the planned trajectory. If any issues arise during drilling, they must be addressed promptly to prevent delays or costly mistakes.

2、2.1

Once a sufficient depth has been achieved, the borehole must be cased using a high-quality casing system designed to withstand the environmental conditions in which it will operate. The casing should be installed securely, ensuring that there are no gaps or defects that could compromise its effectiveness or pose a safety risk. Additionally, the casing must be equipped with inspection ports to allow for regular monitoring of water quality or other parameters as necessary.

2、3.1

After the borehole has been cased, it must be flushed with water or other fluids to remove any residual debris or sediment from the inside wall of the borehole. This process helps to improve the clarity of the water flowing through the hole and reduces the risk of contamination or blockages downstream. Once flushing is complete, the borehole should be sealed with a permanent cement slurry or other suitable material to prevent further seepage or erosion.

3. Casing Installation

3、1.1

Casing installation is another critical aspect of hydrographic monitoring borehole construction, as it provides additional support for the borehole and helps to stabilize its position over time. The casing should be carefully selected based on its strength, durability, and compatibility with the surrounding environment, and installed with precision to ensure proper alignment and tension. Any leaks or gaps in the casing must be detected and repaired promptly to prevent water loss or damage to adjacent structures or infrastructure.

3、2.1

During casing installation, it is essential to maintain accurate records of each stage of the process, including measurements of length, diameter, and weight at various points along the casing path. These data can be used to validate the performance of the casing over time and identify any potential issues that may require attention. Additionally, regular visual inspections of the casing should be conducted to check for signs of wear or damage that could compromise its integrity or function.

3、3

Articles related to the knowledge points of this article:

Title: An Overview of Hydrological Monitoring System Components

Oceanographic Water Monitoring Scheme Design

Title: Rizhao Water Resources Information Monitoring System: A Comprehensive Solution for Coastal City Management

Hydrological monitoring: a prominent role in water management

Title: Nanchang County Water Resources Monitoring Station: A Beacon of Environmental Integrity

Hydrologic Monitoring Work at the Hydrologic Center